Saving money with SunPower Metasol Automatic Circuit Breaker

Today we dealt with SunPower Asia Metasol automatic circuit breaker. It was installed in one of their big outdoor invertors with power output 1.2 MW. DNO requested the site to be G59/3-2 protected.

Engineer from UK Power Networks asked for the site to be controlled at High Voltage side, therefore we integrated G59/3-2 control there.

Read more
Comissioning of our 10 MW solar farm

Today we finally commissioned new 10 MW Solar Farm. G59/3-2 Test went well and without any problems as we were supervising this project from start to finish. This gave us chance to pretest everything individually as we go along. It is ground mount as you can see.Together with our German partners we managed to pull this off in a very tight schedule. This project from start to finish took us only 3 months.

Read more
BIOGAS and Solar Farm with one transformer

Today was a lovely day and we commissioned and G59/3-2 tested very awkward system. Our company dealt with the project from the beginning. We were told that on the field near by they planing to put 1 MW of solar, but they already have a BIOGAS unit totalling 500KW turning on every day from 6PM to 3AM. The old transformer for the BIOGAS unit could take a load of 2 MW Solar no problems. Owners decided to use our scheme.

Read more
High Voltage G59 Wiring

Today we installed G59/3-2 Relay Comap Mains Pro to the High Voltage Switch Gear Unit. Our costumer received Spanish switch gear unit which was not built for British Standards. Therefore we needed to integrate G59/3-2 Relay to this switch gear.

After performing a task we tested the unit. It passed with no fails but this is one out of many chances which people take when they buy foreign equipment of unknown quality. We work together with most known brands for High Voltage and Low Voltage such as Siemens, ABB, PHOENIX, LOVATO and other most known brands which already proved their quality over the years.

Read more
Grid support system with five 2.5 MVa gas generators comissioning

In our age there is loads of different renewable energy generators like Solar PV , BIOMASS , WIND and HYDRO generators all of them affect grid parameters and this results in arising of different problems for the DNO (Distribution Network Operators).

On this project we successfully commissioned grid support system with five 2.5 MVa gas generators in Wales.

Read more
"You can always do more than you think you can"
"You can always do more than you think you can" - today we have visited four 500 KW wind turbines and produced a successful G59/3-2 programming and testing in front of the DNO.  We managed to provide test results for all four of these turbines on the spot, so everything was completed on a single day. It took the client  around 5 years of planning and organising the paperwork to get to the erecting stage, so we decided to go extra mile and offered to complete all the testing in a day, saving a client his precious time.

 
Yet again E-Renewables have proved to be dynamic and highly professional. We would like to hugely  "Thank you" our "Western Power" DNO witness engineer, who agreed to witness all four tests in one go on Sunday, outside of his usual working hours on our request.  We always hope that there could be a little extra understanding achieved while we are communicating with the DNO on behalf of our clients and not a single detail will be missed in the conversation, allowing both parties to better assess the situation and agree on terms and conditions.